国自产在线精品免费_国产精品国产三级在线_精品视频一区二区在线_91天堂素人_欧美亚洲日本在线_视频二区一区国产精品天天

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.liaru.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 大胆av | 欧美aaaaaabbbbb | 欧洲a视频 | 18禁止进入1000部高潮网站 | 国产二级一片内射视频播放 | 欧美乱色视频 | 国产91精品精华液一区二区三区 | 国产精品无码免费视频二三区 | 欧美色欧美亚洲高清在线观看 | aaaa免费视频 | 精品一二三四五区 | 久久精品国产只有精品66 | 国产在线午夜卡精品影院 | 激情白浆 | 少妇对白露脸打电话系列 | 国产野精品久久久久久久不卡 | 91看片资源 | 久久人人艹| 日本永久免费a∨在线视频 91精品国产综合久久小仙女图片 | 成人影院www在线观看 | 亚洲国产精品无码专区影院 | 欧美黑人欧美精品刺激 | 特级全黄男女交高清视频在线观看 | 日本黄色免费片 | 91.精品高清在线观看 | 亚洲av中文无码字幕色最 | 天天做天天爱天天综合网2021 | 亚洲国产精品高清在线第1页 | 国产精品熟女一区二区不卡 | 精品久久久久久一区二区里番 | 久草在线在线 | 欧美色图bt| 中文字幕精品在线播放 | 97超碰97| 肥白大屁股BBWBBWHD | 99c视频色欲在线 | 涩爱av色老久久精品偷偷鲁 | 高清dvd碟片生活片 写作业写着写着就插了视频 | 色AV综合AV综合无码网站 | anquye在线观看 | 久久综合综合久久综合 |